The International Conference Hydropower '98 HP'98) was held in Beijing, China, October 20-24, 1998. The aim of the Conference is to provide an opportunity for the scientists and engineers working in different fields of medium sized hydropower stations to make contact and to exchange information, ideas and experiences in planning, designing, construction, operation and research of hydropower.

This International Conference is jointly sponsored by Chinese Society for Hydro-Electric Engineering (CSHEE) and State Power Corporation of China (SP). On behalf of the academic and organizing committees, I would like to express my sincere welcome and to thanks to the all participants from various countries and regions of the world. I would also like to express my sincere thanks to the cosponsored units, International Committee on Large Dams (ICOLD), International Association for Hydraulic Research (IAHR), Chinese Hydraulic engineering Society (CHES) and the National Natural Science Foundation of China for their support and cooperation as well as HRW-Hydro Magazine, which assure the success of this Conference.

I. Hydropower Development and its Economic and Financial Issues

1  Hydropower Development in China
2  Hazar's Experience on the Hydropower Development in China
3  Hydropower in the Netherlands
4  The Indian Experience of the International Cooperation in Power     Industry Hydropower System in Egypt
5  Successful Middle-Scale Development of the Slovak-Hungarian Section   of the Danube
6  Basin Planning of the Medium-sized Hydropower Station and    Exploitation in Cascade
7  The Development of Middle-Scale Hydropower Stations in Sichuan   Province of China
8  The Shipao Hydropower Project in Taiwan
9  Economic Evaluation of Medium-sized Hydropower Stations
10 A Study on the Environmental Enhancement through the Effective   
11 Utilization of Hydroelectric Power in China-Prospective         Countermeasure and Cooperation Expected to Foreign Partners
12 Environmental Expense - An Unquantitative Measure in Dam    Construction for Hydropower Purpose
13 The Applied Study of Efficient Management Mode of Diagnosis and    Maintenance on
14 Operating Unit Equipment for Hydroelectric Generator Set
15 The Construction and Quality Management in Baishuiyu Hydropower  Station
16 Introduction of the Xiaozhexi Hydropower Project
17 Bulb Type Generators - An Economic Solution for Low Head Hydro    Applications
18 Technical Development of Bulb Turbine Units and Design   Optimization  of Power Plant
19 Probability analysis Method in Economic Evaluation of Hydropower

II. Scientific and Technical Issues of Middle Scale Hydropower

1.  N-Person Game Model and its Application for Water Resources     Development and Utilization
2.  Application of fuzzy Evaluation and AHP Method in Hydropower     Engineering Planning
3.  Project Layout and Optimum Design of Medium-sized Hydroelectric    Power Stations on the Upper Yellow River
4.  Summary on Optimizing Design of the Lianhua Hydropower station
5.  The Analysis and Design of Structure of Power House of Hydropower     Station
6.  Modeling for the Loosening Zones in the Surrounding Rock Mass of    the Underground Powerhouse
7.  Model Test on Girderless Trifurcation of Steel Lining Reinforced     Concrete
8.  Structural Research on High-Pressure Welted Bifurcation Composed    of Inner Steel Lining and Outer reinforced Concrete
9.  Stability Analysis for Wedge Concrete Protection Slab Subjected      Three-dimensional Forces on Overflow Cofferdam
10. The Effects of some Indefinite Factors in the Rigid Limit    Equilibrium Method
11. Study on Blasting Technology for Protective Layer of Structures of    the Three Gorges Project
12. Arch Bridge for Crossing Choshui River to Divert Flow into    Sun-moon Lake for Power Generation
13. Numerical Study on the Underground Pump Stations of the Wanjiazhai    Diversion Project
14. Treatment of Methane Gas Emission at Headrace Tunnel of Shihlin    Hydropower Project
15. The Automation, Remote-control and Centralization of the    Hydropower Plants of Taiwan Power Company
16. The Improvement in the Construction Science and Technique in the     Daxia Hydropower Station in the Yellow River
17. Prototype Observation on the Artificial Aeration System of the     Lower Emptying Tunnel of the Dongjiang Hydroelectric Station
18. Vortices at Hydroelectric Intakes
19. High Water Pressure Test in the Borehole and its Application in     Hydroelectric Project
20. Hydro fracture Stress Measure and its Function and Significance in    Hydropower Projects

III. Planning, Design, Construction and Operation of Pumped-Storage     Power Plant

1.The Design and Rerecognixing of the Panjiakou Combined Storage  Hydropower Plant
2.Design of Baoquan Pumped Storage Power Station
3.Tongbai Pumped Storage Plant in Preparation
4.A Condition Monitoring, Analysis and Diagnosis System for a 300MW   Pumped Storage Hydro-Turbine
5.Surrounding Rock Stability Analysis of the Underground Power House of Tai' an Pumped Storage Power Station

IV. Technical Rehabilitation and Renovation of Hydropower Plants

1.Brief Introduction of Hydropower Rehabilitation in China
2.Rehabilitation - Quick and Unconventional Solutions are Needed
3.Study on the Improvement of the No.1 Unit of Sanmenxia Hydropower  Station
4.State of Are Cleaning Technique at Hydropower station
5.Introduction of shuanggou Pump Storage Groups in songjiang Cascade Hydroelectric Station


To Homepage                   Click here to order by e-mail

กก


| How to Order | Our Services | Your Request and Comments | Link to Us |
Copyright@2000,All Rights reserved.
Huayu Center for Environmental Information Services Co. Ltd.
EMAIL:hceis@mx.cei.gov.cn
P.O.Box 4088, Jianneidajie Youju, Beijing  100001, P.R.China.
Tel: +86-10-63984981 Fax: +86-10-88510673